The project is under the “New Construction” program of the Road Infrastructure Agency and is fully financed with funds from the republican budget. The new facility was built meters away from the bridge on the Stryama River, which collapsed during the floods in 2007. The bridge provides a direct connection to the residents of the villages of Kalekovets and Stryama. The traffic from AM “Trakia” to Rakovski also passes through it. Until now, traffic was carried out on detour routes.

The construction includes the construction of a 7-span bridge facility with a total length of 144 m, a flat culvert – 4 m, reconstruction of a gas pipeline and optical cable, a road version with a total length of 1.5 km, incl. and 3 road junctions with farm roads.

BGN 3,594,393.08 including VAT was invested in the construction activities of the site. The contractor is “HYDROSTROY” JSC.

COMPLETION DATE: July 2015

INVESTOR: ROAD INFRASTRUCTURE AGENCY