The project covers preparation of a technical design and construction of a new bridge facility over p. Ropotamo, at km 16+257 on road ІІІ-992 “Becelie – Yasna Polyana”, ensuring the normal outflow of water volumes, the carrying capacity and durability of the facility, in order to provide conditions for safe movement and comfort for travelers.
AUTHOR: ROAD INFRASTRUCTURE AGENCY (API)