The project covers preparation of a technical design and construction of a new bridge facility over Ropotamo River, at km 16+257 on road ІІІ-992 “Veselie – Yasna Polyana”, ensuring the normal outflow of water volumes, the carrying capacity, and durability of the facility, to provide conditions for safe movement and comfort for travelers.
INVESTOR: ROAD INFRASTRUCTURE AGENCY (API)