The project covers engineering in the field of hydrotechnical construction of 2 sites of high public importance.
OBJECT 1
According to the project, the following have been implemented:
– Pumping station with three working pumps (320 l/sec) and one spare.
– Steel water pipe – D=600 mm with a length of 135.2 m.
– Supply steel water pipe – D=500 mm with a length of L=2,285.29 m.
– Water tank with a volume of 4,350 m3 with four water chambers.
– Rain collector constructed of polypropylene pipes with a total length of 1,067.26 m.
– SCADA – a system for monitoring and controlling the hydrotechnical and electrical equipment has been installed.
COMPLETION DATE: May 2017
INVESTOR: CITY OF SKOPJE AND MUNICIPALITY OF SHUTO ORIZARI, NORTH MACEDONIA
CONTRACTOR: HYDROSTROY AD
OBJECT 2
According to the project, the following have been implemented:
– A pumping station equipped with three water pumps 3x75kW, connected in a common system with a total flow of 200 l/c. A modern system for monitoring and controlling hydrotechnical equipment and electrical equipment (SCADA) was installed in two unifying points: pumps, measuring and regulating equipment, gas chlorination, diesel unit, substation, communication, tank, and PP plant.
– Water tank – rectangular, with a capacity of 1000 m3, with two water chambers placed symmetrically in front of the dry chamber. Each of the water chambers can work independently of the other. Hydromechanical devices, inlet and outlet overflow/empty pipes, valves, and all other necessary fittings are built into the dry chamber.
– Pressure pipeline from the sump to the tank, with a total length of 1685.24 m, made of HDPE pipes ND 450 mm and PN 20/16/10
– A supply pipeline with a total length of 2,186.46 m with a plug into the existing network through a connecting shaft. The pipeline passes under a railway line and a highway.
– Gas chlorination station – a special facility was built in which the facilities for gas chlorination and neutralization are located. The capacity is 2×100 g/hour. The entire system is included in the SCADA control system.
COMPLETION DATE: March 2019
INVESTOR: GEVGELIA MUNICIPALITY, NORTH MACEDONIA
CONTRACTOR: HYDROSTROY AD