The capacity of the facility is 64,560 inhabitants, and it is part of the “Integrated project for the water cycle of Sozopol – I stage” with a total value of BGN 75,087,587, of which BGN 58,239,184 – BFP, provided by the OPE 2007-2013
COMPLETION DATE: September 2015
INVESTOR: THE MUNICIPALITY OF SOZOPOL