Design and construction of a waste transfer station – Karnobat under the project: “Building a regional waste management system in the Burgas region”, financed under the OP “Environment 2007-2013”, priority axis 2 “Improvement and development of the infrastructure for waste treatment”
The value of the design and construction is BGN 3,806,750 excluding VAT.
The waste transfer station is near the existing landfill and has an area of 7.9 decares. The design and construction of a compaction and transshipment facility for transporting waste to the regional landfill “Bratovo – West” has been carried out. The depot has an overload and transport capacity of 10,000 tons per year. A facility for recycling construction and bulky waste with a capacity of 10 tons per hour was also built.
COMPLETION DATE: November 2014
INVESTOR: KARNOBAT MUNICIPALITY