Gabrovo bypass project – Phase 1 – section from km 0+000 to km 20+124.50 and a stage connection from km 0+000 to km 3+130
The Gabrovo bypass is part of the Trans-European Transport Corridor No. IX Bucharest—Ruse—Dimitrovgrad—Alexandroupolis, which is a hub for transport flows in the North-South direction.
The main transport routes served by the site are:
• Ruse – Veliko Tarnovo – Shipka – Stara Zagora – Svilengrad (Makaza)
• Oryahovo – Sevlievo – Shipka – Stara Zagora – Svilengrad (Makaza).
Technical parameters of the site:
• Total length: 23,254 km
• Two-lane Road with a gauge of 10.5 m
• Design speed: 70-80 km/h
• Tunnel: 1 pc. /540m./ from km 12+420 to km 12+960
• Bridges and viaducts: 5 pcs.
• Road junctions: 4 pcs.
• Intersections: 4 pcs.
CONTRACTOR: Consortium “PSVT” with partners: “Hydrostroy” AD, “Road Construction – Veliko Tarnovo” AD, “Road Engineering – T” EAD
INVESTOR: ROAD INFRASTRUCTURE AGENCY