The project envisages the reconstruction of a roundabout along Avenue 45, Saints Constantine and Helena Resort. A recreation area and a new mineral water fountain are being created next to the new roundabout.
The structural part of the project includes the construction of a retaining wall.
As part of the water supply system, a new water supply system was built, supplying a newly designed fountain with mineral water, inspection shafts, a street channel, and drainage elements.
Existing cable lines were moved and lighting fixtures were replaced.
INVESTOR: VARNA MUNICIPALITY