hydrostroy

We Build Building and Great Homes.

We successfully cope with tasks of varying complexity, provide long-term guarantees and regularly master new technologies.

Get in touch

(+380) 50 318 47 07

65 Allerton Street 901 N Pitt Str, Suite 170, VA 22314, USA

The project includes:

•  Reconstruction of the street to the Fisherman’s port with the construction of new asphalt sidewalks, concrete pavers sidewalks, a bike path to the beach in the Asparuhovo district, new parking lots for perpendicular and parallel parking, and a turnpike.
•  Construction of a new storm drain F500 with a total length of 347 m; construction of a new water pipeline for a fishing port Ф160 with a length of 100 m and construction of a domestic sewage system Ф315 with a length of 115 m.
•  Construction of a new pipe channel network with a length of 1887 m and new street lighting with 43 poles and LED lights.

INVESTOR: VARNA MUNICIPALITY