hydrostroy

We Build Building and Great Homes.

We successfully cope with tasks of varying complexity, provide long-term guarantees and regularly master new technologies.

Get in touch

(+380) 50 318 47 07

65 Allerton Street 901 N Pitt Str, Suite 170, VA 22314, USA

April 14, 2024

Repair, restoration and strengthening works on breakwater – Varna

Desislava Toncheva

by Desislava Toncheva

Приключва ремонтът на улица „Дубровник“ в район „Приморски“ Home Object: “Repair-restoration and strengthening works on Varna breakwater – II stage” The construction and installation works involved building a protective berm with tetrapod armor, rock mass, and mattresses, as well as filling existing breakwater boxes with rock mass in the section from km 0+793 to km 0+350. Additionally, repairs were made.. Read more

March 2, 2024

Widening of DN1A to 4 lanes and road safety measures, Romania

Desislava Toncheva

by Desislava Toncheva

Widening of DN1A to 4 lanes and road safety measures for the sector between the București ring road and the intersection with the Chitila – Mogoșoaia road Home The project includes the modernization and widening of the road section DN 1A to 4 lanes, connection to the existing network, and implementation of road safety measures – sidewalks, pedestrian paths, and.. Read more

March 2, 2024

Modernization of DJ 172 district road, Romania

PowerAdmin

by PowerAdmin

Modernization of DJ 172 district road, Romania Home Modernization of the district road DJ 172- DN 17 – Cociu- Mocod – Zagra Total length of the ring road: 24 km Builder: a union between SC FRASINUL SRL, HYDROSTROY AD, and SOMEȘ-TOP-GRUP SRL. The total value of the project: 80,682,897 lei (16,303,856 euros) Duration of implementation: 16 months (2 months design,.. Read more

March 2, 2024

Modernization of county road DJ 246, Romania

Desislava Toncheva

by Desislava Toncheva

Modernization of county road DJ 246, Romania Home Modernization of county road DJ 246: Vaslui county border — Tufeștii de Sus — Scânteia — intersection DJ 248 — Șcheia — Drăgușeni — Ipatele — Țibănești, km. 20+450-56+506 In addition to road rehabilitation and asphalt works, pedestrian paths have been restored. A new bridge facility has been built between the towns.. Read more

March 2, 2024

Site in the city of Sofia, 6 “Tsar Osvoboditel” Blvd.

PowerAdmin

by PowerAdmin

Site in the city of Sofia, “Tsar Osvoboditel” Blvd. No. 6 and “G. Benkovski” No. 3 Home The most beautiful building on the yellow cobblestones – the former headquarters of DZI on Tsar Osvoboditel Blvd. in the heart of Sofia has become the corporate office of Hidrostroy JSC. The authors of the monumental building are Georgi Fingov, Nikola Yurukov and.. Read more

March 1, 2024

Project “Bypass of the town of Gabrovo”

PowerAdmin

by PowerAdmin

Project “Bypass of the town of Gabrovo” Home Gabrovo bypass project – Phase 1 – section from km 0+000 to km 20+124.50 and a stage connection from km 0+000 to km 3+130 The Gabrovo bypass is part of the Trans-European Transport Corridor No. IX Bucharest – Ruse – Dimitrovgrad – Alexandroupolis and is a hub for the movement of transport.. Read more

1 2 3 4 14