hydrostroy

We Build Building and Great Homes.

We successfully cope with tasks of varying complexity, provide long-term guarantees and regularly master new technologies.

Get in touch

(+380) 50 318 47 07

65 Allerton Street 901 N Pitt Str, Suite 170, VA 22314, USA

March 1, 2024

Teatralna Park Residence

PowerAdmin

by PowerAdmin

Teatralna Park Residence Home “Hydrostroy” AD is the main contractor of one of the most modern residential complexes in the center of Sofia. Teatralna Park Residence is the first closed complex in the Oborishte district. The architectural project offers for sale 277 two-, three-, four- and multi-bedroom apartments and penthouses in 6 entrances and adjacent underground garages. The building has.. Read more

March 1, 2024

Project “Bypass of the Town of Gabrovo”

Desislava Toncheva

by Desislava Toncheva

Проект „Обход на гр. Габрово” Home Gabrovo bypass project – Phase 1 – section from km 0+000 to km 20+124.50 and a stage connection from km 0+000 to km 3+130   The Gabrovo bypass is part of the Trans-European Transport Corridor No. IX Bucharest—Ruse—Dimitrovgrad—Alexandroupolis, which is a hub for transport flows in the North-South direction. The main transport routes served.. Read more

March 1, 2024

Rehabilitation of municipal road DOB 1149 – Road I-9, Kavarna-Balchik – Topola – Ikantalaka – Tuzlata – Balchik – Albena

Desislava Toncheva

by Desislava Toncheva

Рехабилитация на общински път DOB 1149 – Път I-9, Каварна-Балчик – Топола – м. Икантълъка – м. Тузлата – Балчик – Албена от км 4+500 до км 10+020 Home The activities are part of the project “Improving the connection of tertiary nodes Mangalia and Balchik to TEN-T infrastructure”, Priority axis 1 “A well-connected region”, Specific objective 1.1. “Improving the planning,.. Read more

March 1, 2024

Implementation of rehabilitation works at the Borcеa junction, located on Highway A2, Romania

Desislava Toncheva

by Desislava Toncheva

Implementation of rehabilitation works at the Borcea junction, located on Highway A2, at km 149+680, Romania Home The rehabilitation contract includes complex repair activities such as replacement of the waterproofing, the pavement of the roadway and the sidewalks, replacement of pedestrian and guiding railings, replacement of expansion joints, repair of the concrete slab, restoration of the anti-corrosion protection of the.. Read more

March 1, 2024

Ring belt of the city of Sfantu Gheorghe, Covasna County, Romania

PowerAdmin

by PowerAdmin

Rehabilitation of municipal road DOB 1149 – Road I-9, Kavarna-Balchik – Topola – Ikantalaka – Tuzlata – Balchik – Albena from km 4+500 to km 10+020 Home According to the Regional Directorate of Roads and Bridges in Brasov, the Sfantu Gheorghe bypass is the biggest investment in Covasna County since the 1990s. 4 roundabouts have been built along the VO12F.. Read more

March 1, 2024

Rehabilitation and modernization of county road DJ 242, Romania

Desislava Toncheva

by Desislava Toncheva

Rehabilitation of municipal road DOB 1149 – Road I-9, Kavarna-Balchik – Topola – Ikantalaka – Tuzlata – Balchik – Albena from km 4+500 to km 10+020 Home The project “Rehabilitation and modernization of the regional transport infrastructure on the route Vârlezi – Tg. Peony – Umbrărești – Viile – Fârțănești – Foltești (DJ 242)” is financed under the Regional Operational.. Read more

1 2 3 4 5 15