hydrostroy

We Build Building and Great Homes.

We successfully cope with tasks of varying complexity, provide long-term guarantees and regularly master new technologies.

Get in touch

(+380) 50 318 47 07

65 Allerton Street 901 N Pitt Str, Suite 170, VA 22314, USA

January 4, 2024

Road variant and bridge over the Stryama river on road ІІ-56 Brezovo – Plovdiv at km 84+540

PowerAdmin

by PowerAdmin

Road variant and bridge over the Stryama river on road ІІ-56 Brezovo – Plovdiv at km 84+540 Home The project is under the “New Construction” program of the Road Infrastructure Agency and is fully financed with funds from the republican budget. The new facility was built meters away from the bridge on the Stryama River, which collapsed during the floods.. Read more

January 3, 2024

Engineering of a wastewater treatment plant – Tryavna

PowerAdmin

by PowerAdmin

Engineering of a wastewater treatment plant, inlet collector and inlet technical infrastructure – Tryavna Home The implementation of the facility is within the framework of the project “Construction of a wastewater treatment plant – Tryavna and a collector leading to it” worth BGN 13.1 million. The project was financed under the Operational Program “Environment 2007-2013” (OPES). Design and construction of.. Read more

January 2, 2024

Reconstruction and overhaul of the “Congress” hall of the Palace of Culture and Sports – Varna

PowerAdmin

by PowerAdmin

Reconstruction and overhaul of the “Congress” hall of the Palace of Culture and Sports – Varna Home After nearly 46 years of successful operation, the Congress Hall must be brought into line with the modern requirements of international sports federations, as well as with the current architectural, construction, technical, and installation standards, which will improve the use, safety, and access.. Read more

January 1, 2024

Improvement of the ecological condition of the municipality of Byala, through the construction and reconstruction of the water supply infrastructure

Desislava Toncheva

by Desislava Toncheva

Restoring the design parameters of 16 km of pavement, water and storm sewers, and cable channels – Varna West Port Home The project “Improving the ecological condition of the town of Byala, through the construction and reconstruction of the engineering infrastructure of the town of Byala, the area for villa and resort tourism “Chaika” and the locality “Gliko” is financed.. Read more

January 1, 2024

Repair of crossroads on Road I-9 at km 99+095 – Dolna Traka, city of Varna

PowerAdmin

by PowerAdmin

Crossroads on Road I-9 Kranevo – Golden Sands – Varna – Burgas at km 99+095 – Dolna Traka, city of Varna Home The repair works at the road intersection on the I-9 road Kranevo – Zlatni Pyastsi – Varna – Burgas at km 99+095 – Dolna Traka, city of Varna include repair of the road surface, new pavements and curbs,.. Read more

December 31, 2023

Reconstruction of the internal water supply network of the villages of Vaklino, Durankulak, Ezerets and Krapets – Shabla municipality

Desislava Toncheva

by Desislava Toncheva

Restoring the design parameters of 16 km of pavement, water and storm sewers, and cable channels – Varna West Port Home The project “Reconstruction of the internal water supply network of the village of Vaklino, the village of Durankulak, the village of Ezerets, and the village of Krapets, Shabla municipality” was financed under contract No. 08/321/01362/27.11.2012 with the Ministry of.. Read more

1 10 11 12 13 14